Fire safety and preparedness expert company Safetum will take into use a civil defence shelter in a Finnish residential building in September 2022. Technical preparations will be made for the shelter and the inside elements of the shelter will be removed. The aim is to get the shelter in usable condition in a required 72-hour time window. After that there will be a maximum number of people testing the shelter for a couple of hours. Finally, we will produce a public report with conclusions about the experiment. Lue lisää >